Winter is a good time to get internal plastering done. You’re indoors, out of the rain and frost, and the work can carry on all season. A few simple checks will help you get a smooth finish.
1. Check the wall, not just the room
A room can feel warm while the wall or ceiling is still cold. Plasters have their own application conditions, so check the temperature of the surface as well as the air, and let the building warm up gradually before you start. Make sure the central heating of the room has been turned off a few hours before applying plaster.
2. Prepare and prime
Make sure the background is sound, stable, suitably dry and free from dust, grease and loose material. Treat any damp areas before covering them. EWI-303 Gel Primer prepares suitable internal surfaces, and its gel consistency makes it practical to apply on walls.
3. Choose the right plaster for the stage
• PRO-510 Insulated Undercoat: a lightweight undercoat for insulating and acoustic qualities
• PRO-511 Hardset: a fibre-reinforced undercoat for levelling suitable masonry before the finish
• PRO-570 Ready Mixed Plaster: a ready-to-use finishing plaster for walls and ceilings, giving a smooth surface for decoration
These aren’t specifically cold-weather products, so apply them only within the conditions in their current data sheets. Shop internal plasters
4. Give it time
Colder, more humid conditions can slow drying. Allow extra time between primer, undercoat, finish and decoration, and wait until the plaster is fully dry before decorating. A wall can look dry on the surface while moisture remains inside. Even in these colder months ready-mixed plaster can be painted much sooner than traditional gypsum plasters.
5. Heat and ventilate gently
Warm the room gradually and keep conditions steady. Keep heaters away from fresh plaster, as very intense heat can dry the surface too fast and cause cracking. Allow gentle ventilation to let moisture out, without strong draughts across fresh work, and watch for condensation.
6. Check the data sheet and store materials properly
Application temperatures, drying times and storage conditions vary between products. Check the current Product Data Sheet before you start, and store materials as it says.
Quick winter checklist
☐ Wall and air temperature within the product’s range
☐ Surface dry, stable and prepared
☐ Correct primer used
☐ No unresolved damp or condensation
☐ Materials stored correctly
☐ Gentle ventilation, heaters away from fresh work
☐ Enough time between coats
☐ Current data sheet checked